[ 27-06-2004 ] 88 Olympic highway was completed (27th June 1984)
88Olympic highway was completed in 1984. The highway connected between Daegu and Gwangju.
Length is 175.3km, width is 13.2 km and the cost is 2 thousands and 39 hundreds millions.
They spent 33 month for the construction works.